Pre-analysis of your installation

Send us the field data for your installation and VITTA IA will carry out an initial analysis: how the pump is working today, how much efficiency the installation is losing and what should be checked. A Juan Azcue technician will review the analysis and contact you.

Only your name, your email and the privacy checkbox are required. For the rest, fill in what you know: VITTA IA works with whatever data there is, and the more there is, the more complete the analysis will be.

Have the rating plates of the pump and the motor to hand. The duty point and electrical data are best measured during the same visit, with the pump running and pumping stabilised.

Pre-analysis form

Fields marked with * are required. All the installation data is optional: fill in what you know.

Your contact details

The installation

1 Duty point Optional

Measured during the same visit, with the pump running and pumping stabilised.

With the pump stopped and the level recovered

m

Pumping at the operating flow rate

m
bar

50 Hz if there is no variable speed drive

Hz

2 Pump Optional

As shown on the rating plate.

3 Motor Optional

As shown on the rating plate.

4 Rising main Optional

m

5 Borehole Optional

From the borehole head to the pump outlet

m
m
mm

6 Electrical parameters Optional

Measured at the control panel with the equipment running.

Phase to phase

V

In one phase, with the equipment running

A
kW

Between 0 and 1

From the control panel to the motor

m
mm²

Anything else